Skip to content
Pet products OEM & ODM manufacturing — Hangzhou, China hello@petinwholesale.com · Lin'an District, Hangzhou, Zhejiang, China

Hooded Dog Sweatshirt

Ref. PW-OEM-18634 Stock reference
Pricing Quoted against your specification

or request a quotation for this item

No cost and no commitment. Adjust quantities, add more references, then send the whole list to our export team in one submission.

MOQ 1,440 pcs per SKU, mixed-SKU cartons accepted
Lead time 45–70 days from artwork approval, confirmed per order
Carton On request

Available customisations

  • Logo, label and hang-tag on product or packaging
  • Colour and material specification against your sample
  • Retail-ready carton artwork, barcodes, multi-language copy
  • Barcode, GS1 and EAN registration support
  • OEM tooling or ODM redesign from your brief
  • Destination-market testing: FDA, EU REACH, LFGB, APPA, CPSIA
Request a quotation

Quotation includes tooling, packaging setup, freight estimate and MOQ options.

Product details

Specification

Hooded Sweatshirt Red 2303B supplied as an OEM / ODM / private-label item: your logo, your packaging, your colour card.

Specifications

  • Material: Polyester Fleece
  • Size: XS/S/M/L/XL/XXL
  • Colours: Red

OEM terms

  • MOQ: confirmed per enquiry
  • Sampling: 7-10 days pre-production sample
  • Artwork: logo, packaging and colour matching supported

What you can change

You choose the shell fabric, the lining and the closure. Your size curve, your labels and your packaging — including retail-ready polybag or hanger.

Sampling and quality control

A pre-production sample is made from your artwork and approved before the bulk run. Stitch quality, label placement and measurement tolerance are verified per size on each production run. Third-party inspection can be arranged at your cost if your compliance team requires it.

Packing and shipping

Units are packed to your carton specification with barcodes and shipping marks as required. We quote EXW, FOB, CIF and DDP, and we can consolidate this SKU with others in your order into one container.

Ordering

Minimum order is 1,440 pieces per colour. Production runs 45–70 days from artwork approval, and a quotation with tooling cost (if any) and freight to your port is returned within one business day.

Key facts

Product
Hooded Dog Sweatshirt
Reference (SKU)
PW-OEM-18634
Minimum order
1,440 pieces per SKU
Production lead time
45–70 days, confirmed per order
Manufactured in
Hangzhou, Zhejiang, China
Customisation
OEM, ODM, private label, custom packaging and artwork
Trade terms
EXW, FOB, CIF, DDP
Packaging
Retail-ready carton, neutral packing or your own artwork

Send your specification. Get a costed proposal.

Product references, quantities and target market — we come back with MOQ options, tooling cost, packaging and a delivery window, usually within one working day.

Request a quotation See the factory